FPSO Abigail Joseph Debottlenecking

Enhancement of FPSO production capacity from 60,000 to 70,000 bopd with expanded gas processing to 120 MMscf/d. Module transportation from Shanghai, China to Anyala West offshore location, followed by heavy lift onto the FPSO.

Anyala-Madu TIP

T&I of 8″ × 1.2km water discharge riser, MADP1 SSIV Manifold installation, and recovery & re-lay of 23.3km displaced MADU Umbilical with J-tube pull-in and termination.

Ikike T&I

15km submarine power cable (3.3kV + fibre optics) installation and burial to 1.5m depth, dive support for spool installation, and full DSV fabrication, procurement and logistics support.

CALM Buoys TIP

T&I of 5-off SPM CALM Buoys with anchor piles, mooring chains, hoses and expansion spools. Pre-commissioning included hydrotesting of 59.94km × 24″ and 32.90km × 48″ submarine pipelines.

Anyala-Madu SURF

CPI transport from Europe, Mid-Water Arch, 2-off RRAs, multiple flexibles (4″–12″), 23.563km power cables, SSIV umbilical, subsea tie-ins, FPSO pull-in, hook-up and pre-commissioning.

Agbami Water Injection Flexible T&I

Loadout, T&I and pre-commissioning of WMB3 Water Injection Flexible Flowline at 1,500m ultra-deepwater, installed between 2 temporary parking frames on the Agbami Field.

Meji Flexible TIP

4″ and 6″ flexible riser/flowlines with Uraducts across multiple Meji jacket connections totalling ~6.12km, concrete mattresses, and pre- commissioning of all flexible flowlines.

ABO Phase 3 SURF TIP

Multi-year deepwater project at 1,400m featuring subsea structures, 5.175km flexibles, 2.235km umbilical, flying leads, and comprehensive tie-in and commissioning operations.