Skip to main content

Marine Platforms

IRM Life of Field Support

Installation · Repair · Maintenance

Past Projects

SHELL NIGERIA (SNEPCO)

Bonga Field Survey Support

Life of field survey support with 38 metrology operations and 37 well marking campaigns in 1,000-1,200m water depth.

TotalEnergies

Egina & Akpo Fields

OIMR campaign support (2018-2023) including metrology operations and wellhead positioning up to 1,500m water depth.

CHEVRON NIGERIA LIMITED

Agbami Field Operations

Continuous survey support for OMR campaigns from 2009 to present including inspection surveys and positioning.

MULTI-FIELD OPERATIONS

Various Nigerian Fields

Survey support across Anyala-Madu, Oyo, ABO Phase 3, and Meji from 5m shallow to 1,500m ultra-deep water

Delivering subsea asset integrity services across Nigeria’s premier offshore fields. Deepwater support from 2009 across Bonga, Egina/Akpo, and Agbami — from Xmas tree and jumper installation through intervention, maintenance, and decommissioning at depths up to 1,500m.

ONGOING
DEEPWATER IRM · 1,000 – 1,200M

Bonga Field — IRM Support

IRM engagement from 2013 — 53 Xmas trees, 48 jumpers, 42 flying leads, 38 metrology surveys, 226 assets recovered, and 37 well…

Discover more
ONGOING
ULTRA - DEEPWATER OIMR · 40 – 1,500M

Egina / Akpo Fields — OIMR Operations

Ultra-deepwater OIMR since 2018 — 16 Xmas trees, 15 jumpers, 3 flying leads, 5 metrology operations, 7 SCM changeouts, and 7 choke…

Discover more
ONGOING
Deepwater IRM · UPTO 1,500M

Agbami Field — IRM Engagement

Founding IRM engagement from 2009 — the longest-running engagement with Marine Platforms Limited. 20 Xmas trees, 18 jumpers, 18 flying leads, 3…

Discover more