Bonga Field — IRM Support

IRM engagement from 2013 — 53 Xmas trees, 48 jumpers, 42 flying leads, 38 metrology surveys, 226 assets recovered, and 37 well markings across hundreds of interventions and maintenance campaigns.
Egina / Akpo Fields — OIMR Operations

Ultra-deepwater OIMR since 2018 — 16 Xmas trees, 15 jumpers, 3 flying leads, 5 metrology operations, 7 SCM changeouts, and 7 choke changeouts covering heavy lift, SERS trials, and complex intervention operations.
Agbami Field — IRM Engagement

Founding IRM engagement from 2009 — the longest-running engagement with Marine Platforms Limited. 20 Xmas trees, 18 jumpers, 18 flying leads, 3 manifolds, 27 SCM changeouts, and 14 acid injections covering installation, maintenance, intervention, flow assurance, and decommissioning.
Bonga Field — Continuous OIMR Support
MPL’s longest-running IMR engagement since 2013 — 53 Xmas trees, 48 jumpers, 42 flying leads, 38 metrology surveys, 226 assets recovered, and 37 well markings across hundreds of interventions and maintenance campaigns.
Egina / Akpo Fields — OIMR Operations
Ultra-deepwater OIMR since 2018 — 16 Xmas trees, 15 jumpers, 3 flying leads, 5 metrology operations, 7 SCM changeouts, and 7 choke changeouts covering heavy lift, SERS trials, and complex intervention operations.
Agbami Field — Founding IMR Engagement

MPL’s founding IMR engagement since 2009 — 20 Xmas trees, 18 jumpers, 18 flying leads, 3 manifolds, 27 SCM changeouts, and 14 acid injections covering installation, maintenance, intervention, flow assurance, and decommissioning.
~22 km Rigid Pipeline Zap-Lok Pipelay
Engineering, procurement, construction, transportation, installation and pre-commissioning of a ~22 km, 10″ rigid pipeline from FLG-1 to FLG-2 using Zap-Lok mechanical joint pipelay technology.
Subsea Structures SSIV · PLEM · Pig Receiver
Engineering, fabrication, transportation, installation and pre-commissioning of SSIV Manifold 2, Pipeline End Manifold (PLEM), and Temporary Subsea Pig Receiver with valves and instruments.
Trenching & Burial
Trenching and burial of the two flexible sections and the ~22 km rigid pipeline — minimum cover depth of 1 metre from mean seabed to bottom of pipe for mechanical protection.
First Integrated Gas Supply System FIGSS Project

Complete EPCI delivery of an integrated gas export system encompassing ~22 km rigid pipeline with Zap-Lok technology, subsea structures (SSIV, PLEM, Pig Receiver), 8″ and 10″ flexible systems, umbilical, tie-ins, and full pre- commissioning.