Transportation, installation and pre-commissioning of 8″ × 310m flexible riser, 10″ × 1,376m static flowline, and 14″ rigid spool connecting PLEM to OGGS pipeline —
Transportation, installation and pre-commissioning of 230m umbilical including TUTU, SUTA, flying leads and jumpers — with topside termination, cable routing, and safety system integration.
Subsea tie-in of export gas flexibles to the rigid pipeline, SSIV manifold, and PLEM. Hook-up of the gas export system to the FPSO and onshore
Engineering design, procurement, fabrication, transportation and installation of umbilical J-tube including subsea clamps and ancillaries. Site assessment and methodology development.
Full integration commissioning of the SSIV umbilical with the platform safety system — cable routing, tubing connection, control panel retrofit, and safety logic implementation.
Full pre-commissioning of the complete gas export system — rigid pipeline, flexible flowlines, SSIV manifold, PLEM, and all subsea infrastructure — including cleaning, gauging, flooding,
Life of field survey support with 38 metrology operations and 37 well marking campaigns in 1,000-1,200m water depth.
OIMR campaign support (2018-2023) including metrology operations and wellhead positioning up to 1,500m water depth.
Continuous survey support for OMR campaigns from 2009 to present including inspection surveys and positioning.
Survey support across Anyala-Madu, Oyo, ABO Phase 3, and Meji from 5m shallow to 1,500m ultra-deep water