Marine Platforms
Complete EPCI delivery of an integrated gas export system encompassing ~22 km rigid pipeline with Zap-Lok technology, subsea structures (SSIV, PLEM, Pig Receiver), 8″ and
Life of field survey support with 38 metrology operations and 37 well marking campaigns in 1,000-1,200m water depth.
OIMR campaign support (2018-2023) including metrology operations and wellhead positioning up to 1,500m water depth.
Continuous survey support for OMR campaigns from 2009 to present including inspection surveys and positioning.
Survey support across Anyala-Madu, Oyo, ABO Phase 3, and Meji from 5m shallow to 1,500m ultra-deep water