Skip to main content

Marine Platforms

0
0
0
0
0
0
0
EPCI top, EPCI

First Integrated Gas Supply System FIGSS Project

Complete EPCI delivery of an integrated gas export system encompassing ~22 km rigid pipeline with Zap-Lok technology, subsea structures (SSIV, PLEM, Pig Receiver), 8″ and

Past Projects

SHELL NIGERIA (SNEPCO)

Bonga Field Survey Support

Life of field survey support with 38 metrology operations and 37 well marking campaigns in 1,000-1,200m water depth.

TotalEnergies

Egina & Akpo Fields

OIMR campaign support (2018-2023) including metrology operations and wellhead positioning up to 1,500m water depth.

CHEVRON NIGERIA LIMITED

Agbami Field Operations

Continuous survey support for OMR campaigns from 2009 to present including inspection surveys and positioning.

MULTI-FIELD OPERATIONS

Various Nigerian Fields

Survey support across Anyala-Madu, Oyo, ABO Phase 3, and Meji from 5m shallow to 1,500m ultra-deep water