Water Discharge Flexible Riser
8″ Diameter1.2km Length
- Transportation & installation from FPSO hang-off
- Rigid tie-in point connection
- Flexible installation analysis & procedures
- Pre-commissioning services
MADP1 SSIV Manifold Installation
Subsea Isolation Valve25-55m WD
- SSIV manifold deployment
- Deployment analysis & procedures
- Installation aids design
- Structural grillages engineering
MADU Umbilical Recovery & Re-lay
23.3km Total Length700m Damaged Section
- Locate & recover damaged umbilical section
- Re-lay new umbilical segment
- J-tube pull-in to TUTU platform
- Scuba diving operations
- Umbilical testing & termination
- Pull-in analysis & procedures