Skip to main content

Marine Platforms

Shell Nigeria (SNEPCO) – Bonga Field

Bonga Field | 1,000-1,200m Water Depth | Life of Field

The Project

Comprehensive life of field survey support for Shell Nigeria’s Bonga field operations, one of Nigeria’s premier deepwater developments. The project demonstrates sustained operational excellence and technical capability in ultra-deepwater environments over multiple years.

Key Operations Delivered

METROLOGY OPERATIONS
0
WELL MARKINGS
0
MAX WATER DEPTH
0 m
LTI RECORD
0

Services Overview

Subsea Wellhead Location Marking: Precise positioning and marking of subsea wellheads for long-term field operations using high-accuracy acoustic positioning systems.

Jumper Metrology Surveys: Dimensional control surveys for subsea jumper installations ensuring accurate fit-up and connection integrity in deepwater environments.

Dimensional Control: High-precision measurement and verification of subsea equipment positions, orientations, and clearances using ROV-mounted laser systems and USBL positioning.

Annual Verification Surveys: Regular integrity surveys ensuring continued accuracy of subsea positioning and equipment status throughout the field lifecycle.