News & Media

Marine Platforms Continues Egina–Akpo Life of Field Support for TotalEnergies

Lagos, Nigeria – Ongoing Since 2018 – Marine Platforms continues to support TotalEnergies in delivering high-performing subsea field support for the Egina and Akpo fields under an integrated OIMR campaign. The project is currently being executed using the African Vision (AV), enabling swift response to subsea service needs across multiple field locations.

Operations to date include:

  • 13 XMAS Tree installations
  • 3 Tree recoveries
  • 15 Jumper installations (Cargo Barge + Supply Vessel)
  • 3 Flying Leads installation
  • HFL/EFL relocation and SFL deployment
  • 7 Choke and 7 SCM changeouts
  • 3 Multiphase module installations
  • Well intervention operations
  • 5 metrology operations
  • Subsea emergency response system trials
  • Annual riser and umbilical inspections
  • Environmental studies

This continuous campaign has further strengthened Marine Platforms’ commitment to reliability, deepwater service expertise, and safety-driven execution.

No Comments

Post A Comment